Mega Butcher
Building features
Parking
| Level | Spaces | Cost | Time |
|---|---|---|---|
|
0
Base equipment
|
20 | — | — |
| 1 | 26 | 200,000 $ | 4.0 h |
| 2 | 32 | 200,000 $ | 4.0 h |
Mega building
Link buildings
| Required buildings | Butchery |
| Max distance | 50 km |
| Cost per link | 60,000 $ |
| Time per link | 2 days |
| Instant link | 999 LE-Gold |
Merge
| Buildings needed | 5 |
| Instant finish cost | 3,999 LE-Gold |
Instant construction is available for mega buildings only after the merge.
Upgrades
Production lines
| Level | Lines | Cost | Time |
|---|---|---|---|
|
0
Starting value
|
1 | — | — |
| 1 | 2 | 200,000 $ | 1 day |
| 2 | 3 | 200,000 $ | 1 day |
Production speed
| Level | Effect | Cost | Time |
|---|---|---|---|
|
0
Starting value
|
100% | — | — |
| 1 | 150% | 200,000 $ | 18.0 h |
| 2 | 200% | 200,000 $ | 18.0 h |
Retooling speed
| Level | Effect | Cost | Time |
|---|---|---|---|
|
0
Starting value
|
100% | — | — |
| 1 | 150% | 100,000 $ | 18.0 h |
| 2 | 200% | 100,000 $ | 18.0 h |
Product storage
| Level | Effect | Cost | Time |
|---|---|---|---|
|
0
Starting value
|
200 | — | — |
| 1 | 800 | 100,000 $ | 18.0 h |
| 2 | 1500 | 100,000 $ | 18.0 h |
| 3 | 2500 | 400,000 $ | 1 day · 12 h |
Input storage
| Level | Capacity | Cost | Time |
|---|---|---|---|
|
0
Base equipment
|
0 | — | — |
Produced product
Chicken meat
Used for processing in …
Mega / Processing
Produced product
Meat
Used for processing in …
Mega / Processing